Sanitary Sewer Repair

Completion Date

Location

Industry

Sanitary Sewer Repair

Scope of Project: Shoring / Excavations / Pipe Bursting / Isolation bags / Fusing / HEI’s / Monitoring / Backfill

 

Location and Year: Suncor Base Plant – 2022

 

Project Challenges and Solutions: Rotaflow was awarded the SOW to repair a damaged section of the sanitary sewer system, which was on a Fire Lane, so it made it much more challenging. The Sanitary sewer system was an older line, so pipe bursting was the best way to complete this scope.

Related Projects

grocery-store-development-edmonton-1

Fire Sprinkler System Design and Construction – Grocery Store Development, Edmonton

underground-fire-standpipe-system-edmonton-lrt-1

Underground Fire Standpipe System Installation – LRT Expansion Project, Edmonton, Alberta

Fire water deluge system – railcar side view showing nozzle spray coverage

Fire Water Deluge System – Railcar Loading Station & Pressure Vessel Protection

new-car-dealership-south-edmonton-1

Fire Protection System Design and Installation – New Car Dealership, South Edmonton

Rotaflow facility at sunset

Need Help With Your Project?

From scoping and detailed design to construction and maintenance, if you’ve got questions or ideas you would like to share, send a message.