Sanitary Sewer Repair

Sanitary Sewer Repair Scope of Project: Shoring / Excavations / Pipe Bursting / Isolation bags / Fusing / HEI’s / Monitoring / Backfill Location and Year: Suncor Base Plant – 2022 Project Challenges and Solutions: Rotaflow was awarded the SOW to repair a damaged section of the sanitary sewer system, which was on […]
Industrial Sewer Repair

Industrial Sewer Repair Scope of Project: Shoring / Excavations / lining the interior of the Pipe / Isolation bags / HEI’s / Monitoring / Backfill Location and Year: Suncor Base Plant – 2023 Project Challenges and Solutions: Rotaflow was awarded the SOW to repair a damaged section of the industrial sewer system, This […]
Temporary Drain Project

Temporary Drain Project Scope of Project: Fusing / Fabrication / Installation Location and Year: Albian Sands – 2023 Project Challenges and Solutions: Rotaflow was awarded the SOW to fuse 12” and 20” HDPE lines around a Tank for drainage. The challenges were working under pipe racks a go nd multiple trades taking a tank down. […]
Potable Water Re-Route

Firewater Hydrants / Valve Replacements Scope of Project: Shoring / Excavations / Fusing / HEIs / Bolt-ups / Backfill Location and Year: Suncor East Tank Farm – 2020 to current Project Challenges and Solutions: Rotaflow was asked to replace numerous Hydrants and Valves in the ETF. The scope had to be done in sequence, so […]
Fire System Maintenance for an Oil & Gas and Mining Site

Fire System Maintenance for an Oil & Gas and Mining Site Scope of Work- Fire Alarm Inspected and test Fire Alarm system to the requirement of the Alberta Fire Code and in conformance with CAN/ULC-S536, Inspection and Testing of Fire Alarm Systems and CAN/ULC-S561, “Installation and Services for Fire Signal Receiving Centers and Systems.” Provide […]
Arc Flush Study for the Installation of Permanent Power in Tailing Facility

Arc Flush Study for the Installation of Permanent Power in Tailing Facility Scope of Work- Rotaflow conducted an arc flash study for the installation of permanent power for an Oil & Gas Tailings facility which encompasses the circuit breaker at switchgear and all downstream equipment including MFT drying and MPSU polymer system. This study provided […]
Detailed Electrical & Instrumentation Engineering Design for a Cold Process Water Unit

Detailed Electrical & Instrumentation Engineering Design for a Cold Process Water Unit Scope of Work- Rotaflow performed a Pre-DBM study for Gland and Tempering Water Pumping System for an Oil & Gas upstream Plant Cold Process Water unit(CPW) for an Oil & Gas upstream unit Cold Process Water unit. The process study provided engineering recommendations […]
Modification of Existing Barges – Oil Sand Mining Facility

Modification of Existing Barges – Oil Sand Mining Facility Scope of Work- Replacement of existing pump/motors located on the electric Barge and installation of six vertical turbine water pump/motor assembly, Knife gate valves with Electrical actuators, Magnetic/Cidra flow meters and pressure transmitters along with Pressure gauges. Instrumentation on pond water lines was needed to control […]
Main Fire Water Pump Replacement

Main Fire Water Pump Replacement Project Undertook the entire GC scope including engineering and procurement support, construction and commissioning (Replacement in Kind) of 5000gpm Fire Water Pump House. Project came in 1% under budget No safety incidents or issues arose during the project Many changes during the project execution
Flow Testing

Rotaflow Flow Testing All fire pumps are required by code to be annually tested to confirm their performance. This video is an annual flow test of a fire pump using our flow test trailer. The flow test trailer provides accurate results, decreases overall test time, and de-chlorinates testing water